Telekosang Hydro One Sdn Bhd (TH1) and Telekosang Hydro Two Sdn Bhd (TH2) is a Joint-Venture Company with Inno Hydropower (T) Sdn. Bhd. (wholly owned by Yayasan Sabah) that was established to primarily focus on the development, ownership and operation of Small Hydro Power (SHP) plants along Telekosang River, Tenom Sabah. The collaboration is aimed among others, at enhancing production of renewable energy resources to cater for the improvement of electricity security and socio development in the state of Sabah.

PROJECT AWARDS

"Best ESG Green Financing in Malaysia - Alpha Southeast Asia's 13th Annual Best Deal & Solution Awards 2019" awarded to Telekosang Hydro One.

Alpha Southeast Asia reviewed over 66 bank submissions covering over 235+ deals/solutions from commercial and investment banks throughout the Southeast Asian region.

"Best Renewable Energy Sukuk - Hydro" at The Asset Asian Awards 2020 awarded to Telekosang Hydro One.

The Asset Asian Awards Islamic Finance recognize the best Islamic banks and houses, as well as the deals that defined the industry during the review period.

"The Blueprint Award 2019" at the RAM League Awards 2020 awarded to Telekosang Hydro One.

The RAM League Awards fetes exceptional transactions and organisations that pioneer new structures and landmark deals.



THE PROJECT

Telekosang river terrain Telekosang river terrain

The development of an integrated 40MW SHP scheme is located on the Telekosang River in Tenom, Sabah. The Project is designed as a cascading hydroelectric scheme where both TH1 Plant and TH2 Plant are situated along the same river such that the run-off discharge of TH2 Plant will be used as the water intake source for the TH1 Plant.

Cascading small hydroelectric scheme Cascading small hydroelectric scheme

PLANT TELEKOSANG HYDRO ONE TELEKOSANG HYDRO TWO
Capacity
Installed Power 24MW 16MW
Declared Availability (p.a.) 147,168 MWh 98,112 MWh
Term 21 years 21 years
FiT Rate 24 sen 24 sen
COD 16th Feb 2023 26th Dec 2023
Hydrology
Catchment Area 828 km2 620 km2
Design Flow 19.4 m3/s 15.0 m3/s
Gross Head 154 m 132 m
River Intake Gravity Weir Gravity Weir
Water Conduit
Turbine Type Francis Francis
Generator Type Synchronous Synchronous


Progress Diagram

Telekosang Hydro One Progress Diagram
(Percentage Completion)

* As of 31st December 2023

Progress Diagram

Telekosang Hydro Two Progress Diagram
(Percentage Completion)

* As of 31st December 2023


Project Status as of 31st December 2023

Workplace MSS Tenom TH1 Powerhouse TH2 Powerhouse Transmission Line
×

MSS Tenom (100%)

Installation of Gas Insulated Switchgears (GIS) – Apr ‘22

Cinque Terre
×

MSS Tenom (100%)

Installation of Gas Insulated Switchgear (GIS) – Apr ‘22

Cinque Terre
×

MSS Tenom (100%)

GIS – Tx Cable Installation – Apr ‘22

Cinque Terre

Archive

×

Transmission Line (TH1:70%, TH2:65%)

Laying of underground cables – May’22

Cinque Terre
×

Transmission Line (TH1:70%, TH2:65%)

Laying of underground cables – May’22

Cinque Terre
×

Transmission Line (TH1:70%, TH2:65%)

Transmission line disconnector switch Installation – Apr’22

Cinque Terre

Archive

*Click the locations on the map to view photos and videos of the projects.

TH1 Current Update

Initial Operation Date 5th November 2022
Commercial Operation Date 16th February 2023
Energy Generated in 2023 146,357,880 kWh
IRENA CO2 Avoidance 103,182.31 tonne CO2
Average Plant Efficiency 79.7%

TH2 Commercial Operations Date 26th December 2023



TELEKOSANG ASEAN GREEN SRI SUKUK (TAGSS)
& TELEKOSANG ASEAN GREEN JUNIOR BONDS (TAGJB)

On 6 August 2019, TH1 has successfully issued Islamic Medium-Term Notes (IMTN) of RM470 million in nominal value under the Shariah principle of Wakalah Bi Al-Istithmar with AA3 rating and junior bonds of RM120 million in nominal value with A2 rating assigned by RAM Rating Services Berhad. The TAGSS is aligned with the requirements of Securities Commission Malaysia’s (SC) Sustainable and Responsible Investment (SRI) Sukuk Framework, the ASEAN Green Bond Standards (ASEAN GBS), and the globally recognised Green Bond Principles (GBP) and the TAGJB is aligned with the requirements of the ASEAN GBS and the GBP. TH1 is the issuer of both the TAGSS and TAGJB to part finance the development of both the TH1 Plant and TH2 Plant which are deemed as eligible, sustainable and responsible investment projects pursuant to paragraph 7.07(c) and 7.08(a)(i) of the SC’s Guidelines on Unlisted Capital Market Products under the Lodge and Launch Framework and eligible green projects pursuant to paragraph 4.1.5(i) under the ASEAN GBP (Eligible Green SRI Projects)



TAGSS TAGJB
Facility ASEAN Green SRI Sukuk ASEAN Green Junior Bonds
Rating AA3 A2
Amount RM 470mil RM 120mil

* The Issuer has complied with the submission of monthly Environmental Compliance Report to the Environmental Protection Department of Sabah until the completion of construction.


Eligible Green SRI Projects

TAGSS
RM'm
TAGJB
RM'm
Original amount earmarked for
TH1 Project 269.1 10.4
TH2 Project 166.6 6.9
436.7 17.3
Amount utilised as of 31st Dec 2023
TH1 Project 269.1 10.4
TH2 Project 166.6 6.9
436.7 17.3
Amount unutilised as of 31st Dec 2023
TH1 Project - -
TH2 Project - -
- -


Stakeholders



Impact Reporting

4 turbines rated at 40 MW
capacity of the SHP Plants
TH1 COD
16th February 2023
TH2 COD
26th December 2023
Expected Power output of 245,280 MWh
per annum (declared annual availability)
172,909 tonnes of CO2 avoided annually
based on IRENA @ factor of 0.705
Up to 1000 Jobs
supported during construction

Project Reporting

CONTACT

Lets get in touch. Send us a message:

THE TEAM

Telekosang Hydro One Sdn. Bhd.
Telekosang Hydro Two Sdn. Bhd.

A-2-13 Plaza Damas 3,
63 Jalan Sri Hartamas,
Taman Sri Hartamas,
50480 Kuala Lumpur,
Malaysia.
Tel: 03 6211 5788
Fax: 03 6211 1788
Email: telekosanghydro@jentayucapital.com